Skip to main content
Aerial view of buildings under construction in London

Fire performance starts with what lies behind the façade.

Stamisol A1, Stamisol Safe One and Don & Low Proshield®: façade membranes classified Euroclass A1, A2-s1,d0 and B-s1,d0, supplied and supported in the UK by Don & Low Fire Solutions.

Stamisol A1

Euroclass A1, non-combustible

Stamisol Safe One

Euroclass A2-s1,d0, W1 water-tightness

Proshield®

Euroclass B-s1,d0, self-adhesive

Serge Ferrari Stamisol

Developed by
Serge Ferrari Group

Three specialist membranes.
Different fire performance requirements.

High-performance façade membranes for projects where fire classification, weather protection and building-envelope performance are important considerations.

Where they sit on the reaction-to-fire scale

BS EN 13501-1 classifies construction products from A1 to F. A classification describes the membrane under test conditions, not the fire performance of the complete façade. All three meet the UK building regulations requirement for membrane fire classification.

What's behind the façade matters.

A building's external appearance tells only part of the story. Behind the cladding, the materials that form the façade build-up have an important role to play in fire performance, weather protection and the long-term integrity of the building envelope.

Choosing the right membrane is part of that process. Understanding its classification, intended application and the conditions under which it has been assessed is essential.

Understanding fire performance

Designed for demanding façade applications

The right membrane depends on the construction, the design and the performance requirements of the building.

Every application needs to be assessed against the relevant product classification, test evidence and installation requirements.

Good specification starts with reliable information.

Datasheets, Declarations of Performance and the Proshield® KIWA BDA Agrément are available to download. Installation guides are in preparation. CAD, BIM and NBS information is sent on request.

All technical resources
PDF

Stamisol A1 datasheet

Product data, PDF, 2 pages

Download PDF
PDF

Stamisol Safe One datasheet

Product data, PDF, 2 pages

Download PDF
PDF

Proshield® datasheet

Product data, Issue 3, December 2025

Download PDF
PDF

Declarations of Performance

All three products

View documents
PDF

Installation guides

In preparation

Available soon
PDF

KIWA BDA Agrément

Proshield®, BAW-25-387-P-A-UK

Download PDF
BIM

CAD, BIM and NBS clauses

Issued per project

Request

Launch announcement, November 2026

Fire safety. Part of the fabric.

Don & Low and Serge Ferrari bring a new generation of fire-performance façade membranes to the UK, led by Liam Blears and the new Don & Low Fire Solutions team.

Campaign visual: a brick tower with a fire-extinguisher head. Fire safety, part of the fabric.
Lausanne building with a geometric black-and-white ventilated façade

Swiss membrane technology. UK manufacturing heritage.

Don & Low has been manufacturing technical textiles in the UK since 1792 and has been part of Thrace Group since 1999. Through its partnership with Serge Ferrari Group, Don & Low brings the innovative Stamisol façade membrane technology to the UK, supported by its dedicated Fire Solutions team.

About Don & Low Fire Solutions
Don & Low, member of Thrace GroupSerge Ferrari Stamisol

Have a façade project to discuss?

Send us the build-up, cladding type and joint design. The Fire Solutions team will confirm which membrane applies, what its classification covers and the evidence you need.

Liam Blears

Head of Fire Solutions

Technical services

fire@donlow.co.uk
Don & Low and Serge Ferrari team at the exhibition